U.S. Bank Stadium

U.S. Bank Stadium is an indoor multi-purpose stadium in Minneapolis, Minnesota, U.S. Opened in 2016, the stadium was built on the former site of the Hubert H. Humphrey Metrodome... Wikipedia

  • Address:  401 Chicago Avenue
  • Location:  Minneapolis, Minnesota, U.S.
  • Owner:  Minnesota Sports Facilities Authority
  • Operator:  ASM Global
  • Executive suites:  131
  • Capacity:  66,202 (expandable to 73,000) Former capacity
  • Record attendance:  72,711 (2019 NCAA Men's Final Four)
  • Field size:  Left field: 328 ft (99.97 m), Left-center: 375 ft (114.3 m), Center field: 400 ft (121.92 m), Right-center: 350 ft (106.68 m), Right field: 300 ft (91.44 m), Left field wall: 8 ft (2.44 m), Right field wall: 34 ft (10.36 m)
  • Surface:  Act Global Xtreme Turf DX
  • Broke ground:  December 3, 2013
  • Opened:  July 22, 2016
  • Construction cost:  $1.061 billion ($ in 2015 dollars)
  • Architect:  HKS
  • Project manager:  Hammes Company
  • General contractor:  Mortenson Construction